Office: +356 21 22 04 31
UAE Office: +971 (0) 567 929 632

Offices and Commercial

Offices and Commercial

Projects

  • Institute of Bankers, G’Mangia
  • Rimus Ltd., Marsa – New Offices
  • Planning Authority, Floriana – New Offices
  • Old Sea Malta Offices, Marsa – Refurbishment
  • Salone delle Rose, Wedding Hall, Gudja
  • Sea Malta New Offices, Marsa
  • Ministry for Social Security, Valletta – New Electrical and Low Voltage Installation
  • Bezzina Brothers, Marsa – Showroom
  • Walshes Ltd., Sliema – Offices
  • Auberg d’Aragon, Valletta – Offices
  • Ministry for Justice and Local Councils, House of Catalunya, Valletta
  • HSBC UK Ltd., Gzira
  • HSBC Fund Management, Gzira
  • Simon Camilleri Holdings, Floriana – Offices
  • Mangion Group of Companies, B’Kara Bypass – FMS Offices
  • HSBC Wealth Management, Victoria, Gozo
  • HSBC, Victoria Branch, Victoria, Gozo
  • HSBC, Hamrun Branch, Hamrun
  • HSBC, Contingency Site, Hamrun
  • Gasan Group of Companies – New Mriehel Headquarters Project including franchise for Ford, Mazda, Jaguar etc
  • A.M. Mangion Ltd. Pharmacy and Clinics, B’Kara
  • Galenika Ltd. Offices and Showroom, B’Kara Bypass
  • HSBC Bank plc. Rabat Branch and Temporary Premesis
  • HSBC Bank plc Tarxien Branch
  • HSBC Bank plc Contingency Site, Tarxien
  • Lexcorp International Ltd. Building, Qormi
  • HSBC Bank plc. Zejtun Branch
  • Air-conditioning for Kana Movement Offices Floriana
  • Offices for Globe Insurance, Ta Xbiex
  • HSBC Operations Centre and Head Offices, Qormi
  • Offices for Melita Cable, Mriehel
  • Malta Environment and Planning Authority Planning Appeals Board Offices
  • AM Mangion Ltd. Head offices and Stores, Luqa
  • Continental Cars Ltd, Volkswagon, Showrooms and Car repair Centre
  • HSBC Branch refurbishment St Andrews, Malta
  • Extension to HSBC Operations Centre, Qormi
  • C&C Offices Swatar
  • Offices for Price Water House Coopers, Qormi, Malta
  • New Offices and Head Office, Simon Camilleri Holdings, Qormi, Malta
  • New Office Block Tumas Group, Qormi
  • New Offices British American Tobacco, Qormi
  • HSBC Extension to Operations Centre Qormi – Level 2
  • Upgrade to Electrical Installation, FimBank, Plaza Sliema
  • HSBC Branch Attard
  • HSBC new Operations Centre area level 3 Qormi
  • New Offices MFCC Ta Qali
  • Audi, Porsch, Showroom, Officess and Car repair Centre
  • Main Electrical installation MFCC Temporary structure for conventions, Ta Qali
  • Banif Bank PAVI Branch Qormi
  • Smart City Kalkara Sales and Site Office
  • New Offices Forestals Mriehel
  • New Offices Deloitte Malta Mriehel
  • Banif Bank San Gwann Branch
  • Banif Bank St Pauls Bay Branch
  • Banif Bank Gozo Victoria Branch
  • AC system Dahlia Offices Gzira
  • Extension to IT Services Building University of Malta
  • Dhalia Real estate sales outlet Vittoriosa
  • BAT contingency Offices and Warehouse Marsa
  • Gasan Properties Centre Penthouse Offices Extension Project
  • Melita Mobile Phones Offices Mriehel
  • HSBC Branch extension Victoria Gozo
  • Malta Enterprise Building San Gwann ventilation system
  • Pro Rector Office University of Malta
  • New Office Block Deloitte (Tumas Group), Mriehel
  • Malta Old University Building Valletta
  • Commercial areas in Block St Julians Schranz Ltd.
  • Lecture Rooms at Old University Building Valletta
  • Banif Bank Branch Fgura
  • Banif Bank Head Office Ventilation System
  • Banif Bank Attard Branch
  • Banif warehouse Msida
  • Banif Naxxar Branch
  • Domestica showroom ventilation system
  • Secondary data Centre University of Malta
  • Razzett Farmhouse
  • Blevinsfrank Offices Mriehel
  • Faculty of ICT Building University of Malta
  • IT Services new Building University of Malta, Msida
  • Calamatta Cuschieri Offices Valletta
  • Banif Bank extension to Head Office Msida
  • Banif Bank Siggiewi Branch
  • University of Malta extension to Biology Sciences Building
  • University of Malta – Biological Sciences Building (Room 112)
  • University of Malta Engineering Building
  • University of Malta –Gateway Building
  • Old University in Valletta – Second Floor Extensions
  • Old University in Valletta – Library First Floor Level
  • Old University in Valletta – Library First Floor Level
  • Old University in Valletta – Basement Level
  • University of Malta – Student House
  • University of Malta –Extension of the Old Humanities Building
  • University of Malta –Lecture Centre Third Floor
  • University of Malta – Library Building
  • University of Malta – Biology Building
  • Sir Temi Zammit Hall
  • UoM Valletta Campus (offices occupied by Heritage Malta)
  • New electrical, Fire and security systems installation Malta Chamber of Commerce Valletta
  • FEMA building University of Malta
  • Banif Bank Rabat Branch
  • EMD Offices - Valletta Waterfront - Vault 14
  • EMD Offices - Valletta Waterfront - Vault 15/16
  • Extension to Price Water House Coopers Offices Qormi
  • Car Park in Qormi
News:

Camilleri and Cuschieri have been chosen as the MEP Consultants for the New Island Hotels Tourist Complex at Hal Ferh, Ghajn Tuffieha - C&C Consulting Engineers have completed in the name of their Clients, Bank of Valletta Limited, the first part of a larger project of installing Photovoltaic Panels  - 

C&C Engineers win a Green Award for their MEP design Of Golden Sands Resort and Spa - Camilleri and Cuschieri win Tender for Design of PV Systems and Intelligent lighting systems for the Private Schools Association - 

Professor Joseph Mifsud, Ing. Carmel Cuschieri of Camilleri and Cuschieri Consulting Engineers and Hoter Ltd were the proud winners of the 11th edition of the Malta Engineering Excellence Awards (MEEA) 2012 - 

Camilleri and Cuschieri Consulting Engineers were responsible for the design and supervision of all of the MEP works associated with the project including the Electrical, Mechanical and Plant for the Lifts as well as for the refurbishment of the Lascaris Ditch.  - 

This was not just another project done by C&C as designing services for radio and television studios is a rare and unique opportunity especially when this is done for the number one radio and TV station on the Island.  - 

The first 2013 activity for Camilleri and Cuschieri staff was held on the 2nd February. We went to the Badger raceway to challenge each other in a Badger Karting race. - 

The University inaugurated an €8 million state-of-the-art IT Services building, Rector Juanito Camilleri – an IT expert and a prime campaigner for added funds for the University – said this investment would not have materialised if EU funds had not been made available by the Government. - 

The new state-of-the-art building of the Faculty of Information and Communication Technology was made possible through European Regional Development Fund and Government of Malta funding, amounting to around €17 million. The aim behind the building is to provide the University of Malta with a Faculty of ICT geared for excellent grade education and for interacting with national and international ICT players, on both academic and industrial levels, and from both research and collaborative perspectives. - 

And here we go… it is time for another activity… - The University of Malta have just completed the refurbishment of the lighting and HVAC systems of the library. With the new extended opening hours these systems play a very important part in the overall building efficiency and hence its running costs. C & C were tasked with this refurbishment and the objective was to optimise the design to reduce running costs.  - 

Summer is here and also the first heat wave so we decided to have an indoor activity this time to stay in an air-conditioned environment.  - Earlier during the year, the air conditioning strategy of the property was reviewed and decision had been reached to replace the aging R22 chillers. A number of options using VRF units, Chillers, DX units or a combination of systems were being considered.  - 

The new building for the University's Faculty of ICT was recently inaugurated - December is here and everyone starts feeling the festive fever coming. - 

The University of Malta have just completed the refurbishment of the air conditioning installation for the Faulty of Engineering.  - Visit to MP3-Italia stand at the Mostra Convegno EXPOCOMFORT 2014 in Milan - 

The University of Malta has just opened its new Home Economics Lab at the Junior College campus. C & C were entrusted with the holistic design of the lab including both the MEP installations as well as furniture and appliances. The overall layout was jointly established with the Home Economics Department at the Junior College as well as the UOM Estates and Works Department. - 

Over the summer period, Radisson BLU St Julian's embarked on a project to change their aging R22 water cooled chillers to R410 air cooled heat pumps.  - 

CSL is a Systems Integrator in Malta specializing in the following:  -